Online
PM

Shared operational investigation

Crusher 02 discharge pressure drop

Severity: CRITICAL

Supervisor workflow

Incident INC-1042 · Crusher 02

Collaboration thread

Status: under_review
Detection Agent02:20 PM
system

Detected a discharge pressure drop on Crusher 02. Expected range 320-340 kPa, observed 262 kPa.

Tool: get_operational_status
Maintenance Agent02:23 PM
agent

Retrieved equipment history. Work order WO-88231 flags suspected liner wear or chamber blockage.

Tool: get_equipment_history
Engineer02:27 PM
human

Throughput was also trending down during the previous shift. This strengthens the blockage hypothesis.

Maintenance Agent02:31 PM
agent

Evidence suggests possible chamber blockage or liner wear. I recommend a planned inspection before the next shift.

Tool: add_annotation
Scheduling Agent02:35 PM
decision

Maintenance window proposed: 02:00-04:00 tomorrow.

Tool: request_maintenance_window
Supervisor02:40 PM
approval

Approved maintenance window for the overnight maintenance crew.

Evidence

  • • discharge pressure dropped to 262 kPa against a 320-340 kPa baseline
  • • throughput trending down since the previous shift
  • • operator confirmation of abnormal chamber sound

Recommended actions

Chamber inspection and health check

approved

Inspect the crushing chamber and liner for wear or blockage before the next operating window.

Owner: Maintenance Team

Maintenance window 02:00-04:00

approved

Schedule an overnight maintenance slot to clear the blockage or replace the liner if inspection confirms wear.

Owner: Scheduling Agent

Audit log

Maintenance Agentget_equipment_history
Historical maintenance and work order data retrieved.
Target: Crusher 02
Scheduling Agentrequest_maintenance_window
Maintenance proposal shared with the supervisor.
Target: Crusher 02
Detection Agentget_operational_status
Plant status checked and anomaly flagged for review.
Target: Plant

Shared operational state

Plant
Raiders
Shift
Shift A
Anomalies
1
High severity
1
Crusher 02 is the primary investigation target and the supervisor has a shutdown decision under review.