Process diagnosis
Bottlenecks
Primary bottleneck
2nd Crusher
Confidence
87%
Severity score
87/100
Evidence
- Throughput decreased by 31% between 14:20 and 15:05
- Oversize material increased by 18%
- Equipment event recorded at 14:21
- Previous shift operating within normal range
Shift health
Active anomalies
1
High severity
1
Site status
critical
All bottleneck candidates
2nd Crusher
highModel score87
- Throughput decreased by 31% between 14:20 and 15:05
- Oversize material increased by 18%
- Equipment event recorded at 14:21
- Previous shift operating within normal range
Conveyor
mediumModel score35
- Load dropped consistently following 2nd Crusher anomaly
- Speed reduced by operator
Mill
lowModel score22
- Feed rate below target
- Running under-utilized due to upstream starvation